• CÔNG TY CỔ PHẦN QUỐC TẾ TOÀN VIỆT

      PART OF YOUR SUCCESS

    DINNING POULTRY (Malaysia) PROJECT (DPP)
    Chủ nhật , Ngày 29/07/2018

    DINNING POULTRY (Malaysia) PROJECT (DPP)

    - Piping engineering design for processing buliding No.1

    - Piping engineering design for processing buliding No.3

    Detailed engineering design

    - General piping layouts

    - Typical support drawings

    - Isometric drawing

    - Thermal hot oil stress analysis report

    - Stream stress analysis report

    - Cooking oil stress analysis repor

    - Material take-off (MTO)

     

    Bài viết liên quan