COCA-COLA BROWNFIELD HANOI
Increase Capacity of existing plant
- Assessment and Evaluation for operation & logistic of beverage plant
- Utilities evaluation for upgrading phases
- Engineering design for capacity development
| Conceptual phase |
- Assess and evaluate limits of the site - Impact codes to site development - Risk assessment of site & operations - Computation of production capacity |
| Basic design phase |
- Utility consumption requirements - Process equipment & piping layout - Calculation required for RM & FG storage - Detailed of logistics - material & people |
| Detailed design phase |
- Production lines –capabilities & packages - Warehouse capacity and storage types - Key Site Plan for movements & emergency - Resultant capacity plan for all areas & utilities |
Copyright © 2018 Copyright by TOAN VIET INTERNATIONAL JOINT STOCK COMPANY. All rights reserved | Thiết kế và phát triển bởi P.A Việt Nam


